News

The fully elevated 19-km Yellow Line, connecting RV Road and Bommasandra with 16 stations, was originally scheduled for ...
Bengaluru’s long-delayed Electronics City Metro is set to begin partial operations by August-end, with BMRCL planning to ...
The 19-km fully elevated Yellow Line, connecting RV Road to Bommasandra with 16 stations, was originally scheduled for ...
Bengaluru South MP Tejasvi Surya has initiated a public countdown for the delayed Namma Metro Yellow Line, urging accountability from BMRCL.
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, ...
The Bengaluru Metropolitan Transport Corporation’s (BMTC) new non-AC limited-stop express services have struck a chord with ...
The 18.8 km stretch has been certified for operations following BMRCL’s receipt of the safety clearance on June 27 ...
A fter months of anticipation, the Bengaluru Metro’s much-delayed Yellow Line, which connects RV Road to Bommasandra via Electronic City, is now expected to open by August 15, according to top ...
BENGALURU: Yellow Line operations will hopefully commence by August 15, with the frequency, number of stations to be ...
The 19.15-kilometre-long Yellow Line will connect RV Road with Bommasandra and will traverse several major parts of the city, ...
Bangalore South MP Tejasvi Surya and other BJP leaders held a protest rally at Lalbagh Main Gate demanding to open the Yellow ...
Amid increasing public pressure to launch the Yellow Line, Bangalore Metro Rail Corporation Limited (BMRCL) Managing Director ...