News

Laboratory and research equipment requires the support of a robust physical plant facilities, which can include: HVAC – e.g. air conditioning and ventilation, over- or under-pressurization, exhaust ...
Construction is expected to total $183 million, which will go toward constructing the multi-story lab, expanding the existing State Health Lab and developing a parking lot to serve both facilities.
International design firm Ware Malcomb announced that construction is complete on 20430 and 20440 Century Blvd, two office buildings converted to a cGMP-ready white box facility and state-of-the ...
Construction Research and Innovation Lab (CRIL) focus on the areas of remote sensing and image interpretation, ... 1/31/2022 Paper "Post-COVID Analysis on Workplace Design and Trend " is accepted at ...
Plans for the 260,000-square-foot One Health Lab call for construction to begin this fall and, ... An estimated project timeline states design work should be completed by September, ...
Design LAB started in the late 1980s as a program called Architect by Children. It's free to schools across Greater Cincinnati though it does require a lot of coordination on behalf of the teachers.
The construction of a purpose-built commercial lab building, One North Quay, has begun at Canary Wharf in London, UK. Canary Wharf Group (CWG) and Kadans Science Partner are collaborating on this ...
Reporters were given a sneak peek inside the Providence facility, which will handle everything from forensics to wastewater ...