News

I'm building a Lean To next to my shop! Check out how I framed it out and added siding. Be sure to check out Part 2, where I add trim and insulation, and Part 3, where I install a roof and doors.
It may be recalled that the bridge cell of SMC had failed to perform structural stability and design check of the Athwa flyover which led to the collapse of the curved portion on June 10.
To pass the test, your system must complete all loops with a Frame Rate Stability of at least 97%. For more details, please read our 3DMark Technical Guide (PDF).